A Brief History Lesson

Following GE Vice Chairman Rice’s imaginative opinion about his perceived lack of any past F-35 Joint Strike Fighter engine competition, we thought we’d provide a public service and jog his memory, by providing a brief reminder of historical facts.

For major platforms like the F-35, complex systems may be procured via a Contractor-Furnished Equipment (CFE) or Government-Furnished Equipment (GFE) acquisition strategy. Either option provides a full and open competition with government participation. When the GFE process is used, the government solicits competing proposals, chooses a winner, and that system is provided to the prime contractor. Conversely under CFE rules, the prime contractor conducts the competition and selects a winner with government oversight and approval.

This latter option was chosen for the F-35 propulsion system, resulting in proposals submitted by Pratt & Whitney and GE to Lockheed Martin, Boeing and McDonnell Douglas, the original JSF contract competitiors. The Pratt & Whitney engine won that competition, and the government approved the process.

 Separately, GE was awarded a contract to begin developing the F136 extra engine. But it has since lost the support of two consecutive presidential administrations, prompting the Defense Department to urge Congress to discontinue F136 funding as the Pratt & Whitney F135 has proven itself at every stage of the development process and now into production.

 Yet, GE and their congressional allies still want to “re-compete” what they failed to win through the transparent down-select process described above. The fact that the F135 is meeting the requirements of the program and has successfully powered the F-35 through flight test stands in stark contrast to GE’s doomsday scenario that an extra engine is needed in case of a devastating, but heretofore completely mythical, fleet-wide grounding issue. But, if such occurrences were really a potentiality, wouldn’t the White House and Pentagon – charged with defending our nation – ask for such a redundancy? And for that matter, why not also mandate duplication in avionics, landing gear and other flight-critical systems?

The answer, as we’ve stated many times before, is that the best engine already won the competition, and has proven itself beyond a shadow of a doubt, through the most rigorous test program to date. As U.S. Air Force Chief of Staff Gen. Norton A. Schwartz said in March 2010, “We are not in the 1980s any longer, where high-performance engines had suspect reliability.”

But despite all the rhetoric in Washington and elsewhere on this issue, this debate really isn’t about “us versus them.” Admittedly, the stakes are high for both engine teams, but they are far more critical for warfighters (who deserve only the best) and taxpayers (who crave fiscal restraint, not politics as usual).

Speaking at an event sponsored by The Hill newspaper on June 23, Joint Chiefs of Staff Admiral Mike Mullen encapsulated the overlapping interest of these two publics when he frankly stated, “The biggest threat we have to our national security is our debt.” He went on to admit that while incentivizing savings is difficult, it has been done over time. If not now, after the competition has already been won, then when?

School may be out, but GE Vice Chairman Rice might want to consider a summer class or two. We recommend History of JSF Procurement 101.

– EagleBlogger

Wednesday, June 23, 2010

Never Too Much of a Good Thing

In As You Like It, William Shakespeare penned the question, “Can one desire too much of a good thing?” More than 400 years later, we can answer emphatically no, you can never have too much, especially when it comes to good news. As the tempo of F-35 Joint Strike Fighter test flights increased in June, so has the frequency of major milestones achieved. In fact, we can count at least three during the last two weeks.

First, the U.S. Navy F-35C carrier variant made its inaugural flight earlier this month, taking off from Naval Air Station Fort Worth Joint Reserve Base. Powered by a production configuration F135, the F-35C logged about an hour of flight time. The F135 Conventional Takeoff and Landing (CTOL) / Carrier Variant (CV) engine received federal government Initial Service Release certification in February, indicating that the engine meets all requirements for safety, reliability, durability and performance, and is therefore cleared for use in the field.

Second, Pratt & Whitney recently celebrated the first installation of a production F135 into a production F-35 aircraft. This marks an important step as this will be the first F-35 aircraft powered by an F135 engine that is destined for our U.S. military.

Last but certainly not least, the F-35B short takeoff, vertical land (STOVL) aircraft achieved supersonic flight for the first time, climbing to 30,000 feet near Naval Air Station Patuxent River and then reaching Mach 1.07. Future tests will eventually expand its flight envelope to its Mach 1.6 maximum. However, it is already clear that the F-35B’s unique combination of short take-off/vertical landing capabilities and supersonic performance will provide the U.S. Marine Corps, United Kingdom and Italy with unprecedented performance and flexibility to operate from smaller ships or austere bases worldwide.

The sum of these milestones is further undeniable proof that the Pratt & Whitney F135 is performing exceptionally well; first in development testing and validation, followed by full production and sustainment. Yet proponents of the F136 extra engine still wage a misleading campaign with brazen disregard to our warfighters, Secretary of Defense, two Presidents and the taxpayers, to try to encourage Congress to continue earmarking funds for this unwanted, unneeded, unaffordable piece of hardware.

In testimony to the Senate Appropriations Committee on June 16, – Defense, Secretary Robert Gates fired back by stating, “We have reached a critical point in this debate where spending more money on a second engine for the JSF is unnecessary, wasteful and simply diverts precious modernization funds from other more pressing priorities. Accordingly, should the Congress add more funds to continue this unneeded program, I will continue to strongly recommend that the president veto such legislation.”

Clarity of language, backed by singular intent, is no less important now than in Shakespeare’s time, especially when the stakes are so high. And while the Bard of Avon might not have posed his question in the context of a fifth generation fighter propulsion system, we won’t shy away from celebrating success at every turn. Production of the ISR-certified F135 is more than our job, it’s an integral part of serving American and allied forces today and in the decades to come. We’ll leave the drama to others.

– EagleBlogger

Friday, June 4, 2010

CNN Contributor: GOP votes for spending boondoggle

CNN Contributor John Avlon has a piece out that's worth a read.

New York (CNN) -- In a time of voter anger at unsustainable government spending and Washington hypocrisy, here's a story that should get your blood up.

Last week, the House of Representatives considered eliminating a nearly half-billion dollar earmark that was snuck into a defense authorization bill. But members of both parties voted to keep the corporate pork in the bill -- despite a supposed moratorium on earmarks and despite that the Pentagon has repeatedly said it doesn't want the money.

Only in Washington would bureaucracy be force-fed a project it doesn't want or need.

But so far, we haven't seen this contempt for taxpayer dollars make its way to protest signs or talk radio driven talking points. That's because President Obama opposes the earmark and the Republican congressional leadership voted for it.

This doesn't fit neatly into the hyperpartisan narrative of screaming about socialism -- in which Republicans bewail overspending by Democrats -- but it's a perfect illustration of how deep the dysfunction is in Washington.

Full story is here.


Wednesday, May 26, 2010

Letter from Defense Secretary Robert Gates on the alternate engine

Dear Representative Larson:

Thank you for your recent letter regarding the Joint Strike Fighter (JSF) program. This program is one of the Defense Department's (DOD) most important, largest and costliest acquisition programs. The JSF budget request reflects DOD's careful, analytical judgment of the best way proceed with a program that is the backbone of future tactical aircraft inventory for the Air Force, Navy, Marine Corps and international partners.

It is true that the DOD identified problems with this program in 2009. Therefore, earlier this year, we took aggressive action to restructure and manage the program. These actions included providing additional funding, replacing the program manager, withholding $614 million in contractor award fees and reducing the number of aircraft purchased in FY11 from 48 to 42. It is DOD's judgment that further reduction of the number of aircraft will increase cost, delay the program and negatively impact our international partners. DOD is confident that the JSF restructuring properly balances production rate with other relevant factors.

Further, I firmly believe that the interests of the taxpayers, our military, and the JSF program are best served by not pursuing an extra engine. Despite the continued opposition by the DOD under two Administrations, Congress has provided $1.3 billion in unrequested additional funding for continued development of this program. We have reached a critical point in this debate where spending more money on an extra engine simply makes no sense and diverts limited modernization funds from more pressing DOD priorities.

DOD's independent Cost Analysis and Program Evaluation (CAPE) estimates that an additional $2.9 billion would be required to take an alternate engine, the F136, to competitive procurement in FY17. While the $2.9 billion cost is real and certain, the benefits of a second engine are not. CAPE has concluded that a second engine might provide savings ifboth engine vendors respond to competitive pressures and drive prices lower and the second engine supplier matches the F135's vendor prices for the duration of the competition. Some international partners are almost certain to only buy the F136 engine made by the General Electric (GE) and Rolls Royce team, and the Navy has stated they will only buy one engine to avoid having to maintain two different engines aboard a ship. While DOD favors competition where possible, in this case there would not be a true competition between the engine vendors, with accompanying reductions in cost. Therefore, it is DOD's strong judgment that these real costs outweigh the theoretical benefit.

In addition, we believe the new GE proposal for the F 136 engine is based on overly optimistic assumptions. This proposal offers a fixed price for the existing engine, but not necessarily the engine that meets DOD specifications. If development problems on this immature design require design or other changes, DoD would be responsible for funding those changes. The proposal also calls for a large number of engines being produced while testing is ongoing, with that risk borne by DOD. The F136 engine is also far less mature than the F 135 engine, with only 200 hours of testing compared to the more than 13,000 hours for the F135 engine. This proposal would simply delay the current F135 engine's progress so the F136 engine could play catch up.

A single engine strategy is not new and does not create unacceptable levels of risk. Contrary to some assertions, the use of a single engine production source has seen a successful strategy for critical tactical fighter programs such as the F-22 and F-18. Further, since the F135 engine is derived from the successful F119 engine program for the F-22, the risk of a fundamental design flaw or other circumstance that would ground the fleet is significantly reduced and manageable.

Given the many pressing needs facing our military and the fiscal challenges facing our country, we cannot afford a business as usual approach to the defense budget. Tough choices must be made -by both the department and Congress -to ensure that current and future military capabilities can be sustained over time. This means programs and initiatives of marginal or no benefit -like the F136 engine -are unaffordable luxuries.

Accordingly, as I have stated repeatedly, I will strongly recommend that the President veto any legislation that contains funding for an extra JSF and unneeded engine.

Sincerely,

Robert M. Gates






Saturday, May 22, 2010

The FACTS on the extra engine for Joint Strike Fighter

FACT: The DoD says it will cost an additional $2.9B to finish the F136 engine.

In a press conference on May 20, Secretary of Defense Robert Gates said, “We do believe that the full-up costs for us are about $2.9 billion. This department has a long and unhappy experience with overly optimistic contractor estimates.” Spending $2.9B in the hopes of saving $1B is not a responsible use of taxpayers’ dollars. The fact is, the extra engine team just keeps asking for (and receiving) billions of dollars despite having made very little progress. In 2008, the extra engine team said they only needed another $1B to finish development. Two years (and $1B later) the extra engine team is STILL saying they only need an additional $1B to complete development.

FACT: There was already a competition to power the F-35.

Competition for the JSF engine happened at the contractor level with all three JSF competitors selecting the P&W engine. This process of selecting subsystems, including the engine, as part of the overall weapon system, is standard during concept demonstration. Last year Senator Lieberman said: “There was a competition to build the engine for the Joint Strike Fighter. General Electric, in its proposal, lost that competition. Pratt & Whitney won that competition. Now, by way of legislation, the proponents of the second engine for this plane are trying to achieve, by legislation, what they could not achieve by competition.” GE has several military engine monopolies including the F-18, Black Hawk and Apache helicopters and the A-10 and they are not pushing an extra engine for those aircraft. GE is only in favor of competition when they lose.

FACT: The manufacturer of the extra engine is the largest supplier of military engines in the world and has several military engine monopolies.

GE is the largest military engine company in the world, producing 70% of U.S. military engines and has extensive military and commercial engine programs including sole-source contracts for more than 14,000 T700 engines for the Apache and Blackhawk helicopters and more than 4,000 F404 engines for the F-18. The extra engine manufacturer isn’t advocating for extra engines for those aircraft. The customer (DoD) has stated repeatedly that it does not want the extra engine, especially if the taxpayers are footing the bill.

FACT: Terminating the extra engine will save U.S. jobs and will not harm the U.S. industrial base.

U.K. based Rolls Royce is developing and manufacturing 40 percent of the extra engine, and a large portion of the Rolls Royce content will result in U.K., not U.S. jobs. In addition, the same number of engines will be built, regardless of manufacturer. A 2007 Institute of Defense Analysis study examined the top extra engine component suppliers and concluded that it is "unlikely that any supplier would exit the domestic industrial base because of F-136 termination".

FACT: Having an extra engine will cost more money, not save money.

The DoD has repeatedly stated that the notional cost savings that would result from further engine competition for the F-35 are based on unrealistic assumptions that they cannot accept. As Secretary Gates put it, “To argue that we should add another $3 billion in what we regard as waste to protect the billion and a half (dollars) that we believe already has been wasted, frankly, I don't track the logic.” The extra engine team claims that the F-35 engine program is worth $100B and that having a competing engine will generate savings. This is incorrect on both counts. First, a GAO report released in March 2010, reports that the engine program is closer to $60B. Second, the upfront cost to design and develop the extra engine will outweigh any potential savings because taxpayers must pay the full cost to develop both engines and foot the bill for two sets of parts, two production and maintenance lines, two technology advancement programs and duplicative personnel and training.

FACT: The firm fixed price offer put forward by the F-35 extra engine team is unrealistic.

Secretary Gates said on May 20, “With respect to the proposal for the extra engine, we think the proposal is based on unrealistic cost estimates. The proposal does provide a fixed price, but not for the engine we need.”

FACT: Funding of the extra engine has and will continue to reduce the number of JSF aircraft the U.S. can afford to buy, will take many away from other, more pressing DoD needs, and will have a negative impact on the warfighter.

When Congress continues to fund the extra engine against the judgment of the President and the DoD, the funding must come from somewhere else. In the past, it has come at the expense of the overall F-35 program and has already cost the JSF program four aircraft--a negative and direct impact on national security. In Congressional testimony, senior military leaders have testified that continued funding would come at the expense of 50-80 additional aircraft, aircraft our military needs. On May 20, Secretary Gates said, “We will strongly resist efforts to impose programs and changes on the department that the military does not want, cannot afford, and that takes dollars from programs and endeavors the military services do need.”

FACT: An extra engine for the JSF increases operational complexity and risk.

Single engine sources are the norm for military aircraft. No other military aircraft developed in the past three decades has been procured with multiple engine suppliers. In testimony in February Chief of Staff of the Air Force Gen Norton Schwartz said, “The reality is that the F-22 and the F-18E/F are single engine airplanes. And, you know, there’s no dispute about that, and it’s because we collectively in the defense community, have become comfortable with the reliability and so on of those respective engines, one of which is a predecessor to the 135.” A case in point is the Pratt & Whitney F119 engine, powering the F-22, which is the safest, most successful fighter engine ever. The reliability of the F119 continues to set records without an extra engine. Inserting an extra engine into a program slows cost and learning curves and present operational risk and challenges to military men and women who will operate and maintain them. Proponents of the extra engine claim that a sole-source engine provider is risky. However, they are the sol-source engine provider on numerous military platforms and have never suggested those platforms need an extra engine.

FACT: The DoD is concerned about the performance of the extra engine program

On May 20, Secretary Gates said, “The proposed engine is based on the design they currently have on the test stand, which we are deeply concerned may not meet the performance needs of the Joint Strike Fighter.” The extra engine, which has yet to power an F-35 in flight, has only accumulated approximately 200 hours in 17 months of testing and has encountered significant technical difficulties. By contrast the F135 has logged more than 17,500 hours, has achieved government certification, has powered vertical flight operations, has delivered the last test engine and has transitioned to F135 production, already having delivered the first four production F135s for use by the warfighter.

FACT: The P&W engine is serving the JSF needs now and into the future and the DoD is concerned about the performance of the extra engine.

On May 20, Secretary Gates said, “The engine is far less mature. The proposed engine is still in development, has about 200 hours of testing compared to 13,000 for the F-135. The proposed engine is based on the design they currently have on the test stand, which we are deeply concerned may not meet the performance needs of the Joint Strike Fighter. Any cost to take the design to required JSF performance levels would presumably be paid by taxpayers.” By contrast, the F135 has logged more than 17,500 test hours, has achieved government certification, has powered vertical flight operations, has delivered the last test engine and has delivered the first four production F135s.

FACT: The DoD does not want or need the extra engine for the JSF.

Secretary Gates thinks funding the extra engine is wasteful and unnecessary. So does President George W. Bush, President Obama, 59 Republican and Democratic Senators, the Chiefs of the Air Force, Navy and Marine Corps, Citizens Against Government Waste, Taxpayers for Common Sense, and many more.

FACT: The extra engine is at least 5 years behind the F135, and has delayed fielding of F-35 aircraft.

The extra engine is 5-7 years behind in development, has yet to power a plane in flight and has logged only a small fraction of the hours expected for this point in their test program. In approximately 17 months of testing, the extra engine has accumulated around 200 hours compared to the more than 2,300 hours that the Pratt & Whitney F135 had accumulated at the same 17-month point. Last year, the extra engine was paid for by delaying the purchase of multiple JSF test aircraft.

FACT: Procuring the F136 will delay Air National Guard deliveries.

The remaining $2.9B needed to complete the extra engine is not included in the defense budget, and must be taken from elsewhere the DoD. Money will have to be taken away from a defense program the military needs in order to fund a program they don’t need. The Air Force and the Air National Guard needs to replace its aging fleet of fighters, bombers and tankers, and wasting $2.9B on an extra engine when their fleet modernizations are underfunded makes no sense. Whether the delay is in JSF deliveries or some other impact to fleet modernization the impact to the Air National Guard will be negative.

FACT: The international JSF partners do not want to fund an extra engine.

The international partners have stated they do not want an extra engine if it will have a negative impact on the program. Buying two engines for the JSF increases the cost to the overall program limits the international partners’ on the quantity of aircraft they can afford, and delays deliveries. Extra engine supporters claim that the original the Memorandum of Understanding signed with the International Partners assured them that they would have an engine choice. In fact, the memorandum simply stated that if there were two engines, the partners could choose.

FACT: A vote for the extra engine is Washington “business as usual".

On May 20, Secretary Gates said, “Let me be clear. I believe the defense budget process should no longer be characterized by business as usual within this building or outside of it….Accordingly, as I have stated repeatedly, should the Congress insist on adding funding for a costly and unnecessary JSF extra engine or direct changes that seriously disrupt the JSF program, or impose additional C-17 aircraft, I will strongly recommend that the president veto such legislation.” Canceling funding for the extra engine has strong bi-partisan support. The Senate sent a loud message last year when a bipartisan group of 59 Senators voted for cancellation. Funding was slipped back in during conference by certain House conferees, voted against it. However, the funding was slipped back in during conference by certain House conferees

Monday, May 17, 2010

Resist the Call of the Sirens

It’s budget markup season in Washington, which means a plethora of seemingly well-intentioned funding requests emanating like songs from the mythical Greek sirens, who lured nearby sailors to the rocky shoreline. Congress would be wise to be wary of these enchanting, but ultimately perilous calls.

Yet some Congressional leaders seem to be swayed, once again, into lending their support for the F136 extra engine for the JSF, despite billions wasted to date, decades of successful single engine military aircraft, strong performance by the F135 primary engine, and the crushing expense of higher priorities in a climate where our nation is facing record budget deficits.

On the one hand, Sen. Carl Levin (D-Mich.) expresses his admiration for Secretary of Defense Robert Gates’ passion for fiscal restraint by stating he “deserves high grades for courage” and that Congress would “like to be helpful.” But then he embraces the false notion of future competition for the engine to power the JSF, despite the Pratt & Whitney F135’s numerous wins throughout the F-35’s development and detailed reports that show that the F136 will consume another $2.9 billion in the unlikely hope of saving $1 billion later.

This knee-jerk reaction to buck the oft-stated wishes of the White House and Defense Department is puzzling, especially given Gates’ most recent comments on the urgent need to reign in runaway spending. En route to Kansas City on May 7, he told the media, “The message that I've had for the Congress over the last couple of years (is) that a dollar that they make us spend on stuff we don't need is a dollar we can't spend on what we do need. And in this constrained budget environment, that becomes all the more important.”

It’s also puzzling that the Senate, which ultimately rejected funding the F136 by a vote of 59-38 in 2009, would now follow the House and re-insert funding during their own committee markup process. The rhetorical similarities are disturbingly striking. Rep. Adam Smith (D-Wash.) and chairman of that body’s air-land panel said, "The committee has always believed that, to be a balanced program, competition needed to be an element of the engine program." Yet, this competition argument has been debunked before, and for good measure, the Pentagon’s acquisition chief Ashton Carter reiterated on May 4, “There is not a good analytical case that the upfront costs of the second engine would be paid back."

During his airborne press conference, Gates added, “One of the members of Congress, I'm told, said, ‘Well, why is $3 billion for the alternative engine such a big deal when we've got a trillion-dollar deficit?’ I would submit that's one of the reasons we have a trillion-dollar deficit, is that kind of thinking.”

In light of the current economic crisis, ongoing war efforts and the strong anti-earmark political climate, it seems Congress would want to make a clean break from pork barrel politics. Resist funding the F136 not simply to avoid the embarrassment and needless conflict associated with a potential Presidential veto. Do so because if this sort of wasteful spending isn’t stopped now, then there is little hope such budgetary recklessness will ever be curtailed. Ignore the selfish and deceitful sirens; instead, heed the clarion call of truth. If not now, when?

-- Eagleblogger

Thursday, March 18, 2010

F135 Engine powers the F-35 to its first vertical landing



From Lockheed Martin: “Today’s vertical landing onto a 95-foot square pad showed that we have the thrust and the control to maneuver accurately both in free air and in the descent through ground effect,” said F-35 Lead STOVL Pilot Graham Tomlinson.

Tomlinson performed an 80-knot (93 miles per hour) short takeoff from Naval Air Station Patuxent River, Md., at 1:09 p.m. EDT. About 13 minutes into the flight, he positioned the aircraft 150 feet above the airfield, where he commanded the F-35 to hover for approximately one minute then descend to the runway.

“The low workload in the cockpit contrasted sharply with legacy short takeoff/vertical landing (STOVL) platforms,” said Tomlinson.

The Week That Was: March 8-12

Perhaps the adage that March “comes in like a lion” applies to more than just weather. That’s certainly what happened the week of March 8. Seemingly overnight, the F-35 engine debate heated up, driven by significant budgetary and programmatic scrutiny.

The week began with a Monday, March 8th issue brief from Dr. Loren Thompson of the Lexington Institute, who encapsulated the issue of alternate F-35 engine funding by reinforcing at least five key points. First, $2.9 billion will be needed in the near term to develop the alternative F136 engine, while predicted savings over the long term are based on highly optimistic assumptions that may never pan out. Second, most modern military aircraft are developed with just one engine supplier and fleet-wide groundings almost never occur. Third, the still nascent F136 is the more likely of the two engines to suffer a significant problem, based on its protracted development and troubled performance to date. Fourth, two engines won’t bolster reliability because operations, maintenance and even future technology improvement funds would be split between two incompatible systems. Lastly, neither the taxpayer nor the F-35 customers would be well served to support two supply chains, when one has clearly outperformed the latter.

This last point takes us to a couple of mid-week articles that initially reported some inaccurate cost figures for the F135. The bottom line: there are no new cost overruns on the F135 engine, and any additional expenses are tied to ongoing restructuring of the entire F-35 program. The federal government continues to express confidence in Pratt & Whitney’s cost reduction strategy, which is illustrated by an 11% drop in the LRIP-4 contract offering. Additional double-digit cost reductions are projected for future lots as well.

These proven savings stand in start contrast to the revisionist claims of those supporting a repeat of the “Great Engine War” of the 1980s. In a February 23rd memo to House Armed Services Committee Chairman Rep Ike Skelton, Deputy Secretary of Defense William Lynn wrote, “While much has been made of this example, the facts tell a more nuanced and inconclusive story. There were only minimal reductions in the acquisition unit cost price of the engines purchased for the F-15 and F-16 programs. Accordingly, it is difficult to cite this example to justify substantial savings due to competition.”

During a Wednesday, March 12th press conference, Undersecretary of Defense Ashton Carter reiterated the Defense Department’s concern regarding “hypothesized savings” for the F136 engine based on “some very optimistic assumptions that we don't think it is reasonable to accept.” And if recouping sunk costs doesn’t hold much allure, neither does the prospect of a second engine on technical grounds.

"We are not in the 1980s any longer, where high-performance engines had suspect reliability," Air Force Chief of Staff Gen. Norton A. Schwartz said. And he reiterated that only the U.S. Air Force is likely to buy from both engine manufacturers. "The Navy is not going to have two engines aboard ship," he said. "Our international partners are not going to have two engines. So the reality is that if we have an alternate engine and if there is a mandate for that, that obligation will ride primarily on the Air Force."

A disadvantageous “directed buy” scenario outlined by Undersecretary Carter and General Schwartz brings us to Gen. (Ret.) John Michael Loh, former commander of the Air Force’s Air Combat Command. In a Defense News editorial published on March 15th, General Loh brought up yet another important issue, stating “Air Combat Command will not receive its first operational F-35s with alternate engines until 2017. In my experience, putting an immature engine on a single engine fighter in high-rate production will result in many unnecessary, perhaps fatal, accidents while the new engine plods through its inevitable infant mortality phase.”

Above and beyond any potential safety of flight issues is the historical fact that two engines impact every facet of operations. “My firsthand experience with the F-16, after the introduction of the alternate engine, showed it limited operational flexibility significantly,” wrote General Loh. “It restricted decisions on basing because all F-16s at a base had to have the same engine, and it limited choices for deploying units for the same reason. Maintenance training and logistics support were more costly and complex.”

So, whether your primary concern is responsible government spending, empowering our military to accomplish their mission, or a combination of the two, the conclusion is the same: the F135 remains the best solution for the F-35 now and for the future.

Monday, March 8, 2010

New Issue Brief on the Alternate Engine

Defense analyst Loren Thompson has posted a new issue brief on the Joint Strike Fighter today noting that the "the key to its success is holding down the cost of the fighters so that all potential users can afford to buy them."

Thompson says a major obstacle to keeping costs down is the billion alternate engine program that has been added by Congress that both the Bush and Obama administrations have found to be a waste of money. According to the brief, the DoD will have to spend a minimum of $2.9 billion beyond what has already been spent to finish developing the engine even though it will have no net financial benefit.

The issue brief also takes a clear eyed look at the so-called "non-financial" benefits offered by alternate engine proponents and finds them lacking.



Thursday, March 4, 2010

Much Ado About Something

Milestones may be commonplace in the aerospace and defense industry, but some are patently more significant than others. Last week saw one such illustrious milestone; but, enough with the suspense.


Pratt & Whitney has achieved Initial Service Release (ISR) for the Conventional Take Off and Landing/Carrier Variant (CTOL/CV) F135 engine powering the F-35 Lightning II. Simply put, ISR means that the F135 meets all safety, reliability and performance parameters for operational use by U.S. and allied warfighters. The F135 engine, the beneficiary of the heritage of the F119 engine powering the F-22, has achieved more than 13,000 test hours and roughly 200 flight hours, and has thus proven itself to the F-35 Joint Program Office and all who rely on its oversight and expertise.


The ISR designation marks the culmination of the CTOL/CV System Development and Demonstration program, during which Pratt & Whitney delivered 17 flight test engines, as well as the first production F135 engine. The final Short Take Off and Vertical Landing (STOVL) flight test engine will be delivered in a few short weeks, while an F-35B continues short landing testing leading up to its first vertical landing. Such steady progress may not generate lots of headlines, but we think quiet competence and consistent performance speaks for itself.


Also last week, the Department of Defense unambiguously reiterated their firm opposition to the F136 alternate engine development program, still in its nascent form yet already having cost the taxpayers billions of dollars.


“The secretary [Gates] has made it clear to you all, and he's made it clear to the Congress time and time again, that the pursuit of a second engine, in his estimation, is a colossal waste of money, and that it will not result in any competition between companies,” said Pentagon Press Secretary Geoff Morrell on February 25. “The so-called great engine wars of the '80s, which…revisionist history would suggest…resulted in some great savings to the taxpayer. I think the actual analysis shows that, if there was a benefit, it was negligible.”


So the contrast is crystal clear. Morrell added, “It's $4 billion that we can't afford to spend, on things that we don't need or are duplicative. We need that money to support our warfighters in the fights they are in now.”


President Obama and Secretary Gates have reaffirmed a veto threat if wasteful F136 funding continues. Congress has the opportunity to fulfill its most basic obligation: direct scarce taxpayer dollars where they will do the most good without needlessly endangering the entire budgetary process. And in light of Initial Service Release for the CTOL/CV F135 and continued progress towards the first vertical landing of the STOVL version – what better argument can be made for the performance of this engine and its readiness to serve?

-- Eagleblogger

Thursday, February 4, 2010

Another notable first

As much of the aerospace community gathers in Singapore for the biennial air show there, Pratt & Whitney marked the occasion by announcing the delivery of the first F135 production engine for the F-35. This major milestone, following close on the heels of the first in flight engagement of the STOVL propulsion system, unequivocally demonstrates the continued maturation of the F135. A strong heritage from the F119 engine powering the F-22-powering, and more than 13,000 test hours have enabled this first delivery of the world’s most advanced fifth generation fighter engine, one that will serve U.S. and allied forces for decades to come.

Meanwhile closer to home, much of the news centers on President Obama’s proposed Fiscal Year 2011 budget. The language urging the termination of the F136 alternative engine program is crystal clear, and represents the fifth consecutive attempt under administrations of both major parties to cancel the F136.

So what’s changed since FY ’07 when the request to cancel alternate engine funding was first made? In addition to the undisputed progress of the F135, as well as our nation’s clear and present economic crisis, the White House, in their budget proposal released last week said that the alternative engine “is no longer needed to prepare against the potential failure of the main JSF engine program…because development of the main engine is progressing well.” Moreover, “financial benefits, such as savings from competition, have been assessed to be small, if they exist at all, because of the high cost of developing, producing, and maintaining a second engine.”

Answering questions during a February 1 press conference, Defense Secretary Gates pledged to “strongly recommend that the president veto any legislation that sustains the unnecessary continuation” of the F136, along with an unrelated program. Simply put, he said, “The level of cost is such now that we have to take a final stand.”

Despite the challenges of developing a new fighter aircraft, Secretary Gates remains bullish on the F-35, stating “it is on track to become the backbone of U.S. air superiority for the next generation.” A single, proven F135 propulsion system is now playing its full part: benefitting the taxpayers with a proven pedigree, rigorous testing, decreasing cost, and now a smooth transition to production. Who says good news is hard to find?

-- Eagleblogger

Wednesday, January 27, 2010

F35 Test Pilot: The F135 has lived up to our lofty expectations

Pratt & Whitney’s F135 propulsion system recently powered the Lockheed Martin F-35B Lightning II short takeoff/vertical landing (STOVL) fighter through the first in-flight engagement of its STOVL propulsion system. In the cockpit, at the controls during this historic flight was Graham Tomlinson, F-35 Lead STOVL Pilot and an employee of BAE Systems. Graham shared his thoughts on the significance of this major milestone, the performance of the aircraft and the performance of the Pratt & Whitney F135 engine.

1. As part of the first F-35B in-flight STOVL engagement, what specific criteria were you evaluating?

Graham Tomlinson: In the cockpit the task is to make sure that the “throttle and stick” responses are as predicted through these first conversions and our first experience of flight in STOVL mode. This really means comparing the responses to the training we’ve done in the simulators. All the responses did match extremely well – pitch, roll, yaw, and thrust - so it was a very easy and satisfying task for me. And the things the simulator can’t reproduce – noises, vibrations etc – were pleasantly subdued in the real thing.

But the key criteria were engineering responses, checked and analyzed on telemetry by the control room team. The pilot only gets a general impression; the engineers can check the detail. We were especially interested in the propulsion system response through the conversions, spooling up the liftfan and radically changing the thrust center of the engine and liftfan combo. We’ve done this static on the ground but never before with the aerodynamic effects of 200 knots (on the doors, on the intake flows, on the liftfan exhaust etc).

And after conversion in STOVL mode this again was our first flight opportunity to check the total thrust response and the balance of thrust from liftfan and core engine which are now not just thrust, but primary aircraft controls. These key parameters, plus the roll bleed posts off the core engine, are absolutely critical to STOVL flight control. The engineers were very pleased with the results.

2. Were there any surprises during the 14-minute STOVL segment of the test flight, not just in aircraft/engine performance, but also how it felt?

Graham Tomlinson: I hadn’t realized some of the limitations of motion simulators. When we make small acceleration requests the simulator gives a modest kick-in-the-pants. In flight, the kick-in-the-pants feels stronger (which all pilots will love!).

The other expected effect, but still nice to confirm in flight, was the smoothness of the ride. The liftfan is right behind your back, and you can hear/feel it humming away, but both the noise levels and the vibration levels were just fine. It’ll undoubtedly get louder as we slow down to the hover, but I was very pleased with the subdued levels at the speeds we’ve tested so far.

3. How would you characterize the performance of the Pratt & Whitney F135 engine and how does its performance differ from other fighter aircraft engines?

Graham Tomlinson: So far in the JSF test program the F135 has lived up to our lofty expectations; it has been there when we want it, and has been no trouble at all. That’s a remarkable achievement for an engine which has to reconfigure from a 40K pound thrust category in Max AB conventional mode, to a 40K pound thrust category with the liftfan spinning in STOVL mode. For me the best thing has been that we simply haven’t had to worry about it!

4. What was going through your mind when you engaged that clutch for the first time?

Graham Tomlinson: The flight test team is super-professional. We’re all thoroughly practiced and trained; we can do the job in our sleep. And that means that for this first button press there was zero stress, we were just going the through a routine test we’d seen a hundred times before. And that’s a good thing too, as pilots’ brains are well known to shrivel to the size of a pea in flight!

5. What is the best part of your job as the F-35 test pilot?

Graham Tomlinson: Being part of the team, bringing back the results and the data we need, and the satisfying feeling when the team makes progress. We’ve just made a huge step forward.

Monday, January 18, 2010

New Year, New Milestones, Same Great Engine

By now, most of you will have viewed the video posted here and elsewhere on the Web showing the first in-flight F-35 engagement of the Short Take Off Vertical Landing (STOVL) Lift Fan propulsion system. Days later, I still get goose bumps watching the F-35 Lightning II, powered by the Pratt & Whitney F135 engine, successfully achieve such a crucial milestone. And while that video engenders excitement and gratification throughout the Pratt & Whitney family as well as among our teammates, it also reminds us that there are numerous milestones ahead as the F135 continues to power Lockheed Martin’s F-35 flight test program while the engine also advances toward full production.

First, however, let’s remember how far we’ve come. Roughly a decade ago, Pratt & Whitney evolved the proven F119 engine (the exclusive propulsion system for the F-22 Raptor) to power both Joint Strike Fighter finalists. Following Lockheed Martin’s selection as the winning prime contractor, Pratt & Whitney began testing and manufacturing 18 flight test engines, the last of which will be delivered shortly. More than 126 test flights and 13,000 test hours later, the F135 remains the only engine to power an F-35, an accomplishment that will continue for quite some time to come.

In the world of jet engine test, there is a metric that is used to determine how the engine is progressing through System, Development and Demonstration. The metric is referred to as risk retirement. As the risk in the program is retired, the engine progresses in maturity. It’s worth noting that 90 percent of the F135’s program risk has now been retired through testing and other verifiable processes. And that number will be even higher by year-end. The most visible benefit of this engineering rigor is that despite the occasional challenge inherent with such a sophisticated propulsion system, the F135 has never caused a flight test delay or in-flight incident.

Pratt & Whitney will deliver its very first production F135 in the coming weeks. Also expected in the near future, and arguably most noteworthy is achievement of Initial Service Release for the Conventional Take Off and Landing/Carrier Variant (CTOL/CV) F135 engine, a key U.S. government endorsement that will mean the F135 meets all safety, reliability and performance requirements for operational use in the field. Simply put, the F135 is about to become the most advanced fighter engine ever certified for the defense of America’s freedom. Stand by for even more goose bumps.

-- Eagleblogger

Monday, December 14, 2009

The Independent: "US threat to Rolls-Royce's fighter engine"

London's Independent reports on the latest problems with the F136:

Loren Thompson, an analyst at America's Lexington Institute, believes Rolls-Royce's engine could be running as much as a year behind schedule. "GE and Rolls can no longer hold to their baseline schedule, and are being forced to replan their entire programme," he said.

A report by Lexington says Rolls-Royce managed just 52 hours of testing this year, because of "four major [engine] failures". The report said the engine would not be ready to benchmark against P&W until 2016. A Rolls-Royce source called this "rubbish".

Rolls-Royce's latest setback involves redesigning a component that helps hold the engine together. A spokesman for the Rolls-Royce/GE joint venture in the US said the re-design was not a particularly complex job and full testing would resume early next year. He said: "The [engine] programme continues to operate within budget and has met all major milestones on schedule ... The engine has accumulated over 550 hours of test time, with more than 800 hours of test since the programme began."


Full story here...

Friday, December 11, 2009

DoD Buzz: F136 Tests Lag Four Months

DoD Buzz has the latest on the alternate engine. The story notes that the backup engine program currently has a "$30 mil­lion a month burn rate" but only 52 hours of testing complete on product-​​configuration engines.

Full story here.

Monday, November 23, 2009

Truth and Consequences

Proponents of the F-35 Joint Strike Fighter received another scare recently when $232 million in funding for vital tooling was placed in jeopardy as part of ongoing federal budget negotiations. While this funding will probably be restored, it could have severely and artificially compromised future production F-35 capacity, which in turn would raise unit costs of the aircraft and slow fighter deliveries to the U.S. and especially its allies.

Why raise an issue that may be on the road to being solved? Because it’s emblematic of the “zero sum” reality inherent in the budgeting process. There is no shortage of priorities, including national defense, yet hundreds of millions of dollars may be wasted on funding an unwanted, unnecessary, under performing alternate engine, in turn, potentially compromising 50-80 airframes, a significant number especially at a relatively early stage in the aircraft’s marketing life.

In light of the latest F136 engine failure and resultant ceasing of all testing, the fourth engine incident in just 52 test hours, the F136 team will be unable to resume testing until early 2010. This means that production F136 engines will not commence delivery in 2012, thus dispensing with the current baseline schedule and necessitating a new (and further elongated) path forward. It has been reported that the alternate engine team is working on a replan for their engine.

Program slippage on this scale is no academic exercise; it will affect nearly every aspect of the F-35, from cost to risk mitigation. And international customers, who play a crucial role in lowering overall unit costs for everyone including the American taxpayer, will have to wait even longer to have an option in propulsion selection.

Full competition between the F135 and F136, the whole premise for having two engines in the first place, will now slip to 2016 deliveries. And even that timeline presupposes that the root causes of multiple F136 test failures can be fully ameliorated without a fundamental redesign and that they will sustain no additional significant test failures in the months and years ahead. The jury is still out.

The F135 continues to perform extremely well, successfully powering the first flight of Lockheed Martin’s AF-1, the first production representative CTOL airplane to fly. The F135 engines also successfully powered BF-1 from Lockheed Martin’s facility in Fort Worth, Texas across country to Naval Air Station Patuxent River in Maryland for continuation of flight test. The F135 propulsion system is also poised to perform the first in-flight STOVL conversion very soon.

President Barack Obama has stated repeatedly that he would veto the federal defense budget bill if F136 funding impacts F-35 acquisition. Surely this is now beyond the shadow of doubt. Though the authorization bill has passed, President Obama could veto the appropriations bill, should it contain wasteful F136 funding.

The F-35 is an official program of record. It shows every sign of being an extremely successful fighter, serving three U.S. armed forces and potentially dozens of allies worldwide. Why some in Congress would choose to fund the F136 engine that falls farther behind the proven reliable F135 seemingly by the day is simply beyond us.

Some might say that all engines go through a difficult gestation. But it’s worth reiterating that during a similar 12-month period to the F136’s four failures in 52 hours, the F135 accumulated 1133 hours with no failures. Try as some might to obfuscate, these facts remain the same.

-- Eagleblogger

Wednesday, November 4, 2009

A Tale of (Not Quite) Two Engines

As the FY10 budget battle continues on Capitol Hill, in the White House and throughout numerous federal agencies, it is worth a few moments of reflection to consider the truly monumental task at hand. Urgent funding for two wars, economic stimulus, health care reform, a looming Baby Boomer demographic tsunami, record unemployment, decreasing tax revenue, a weak dollar, resurgent adversaries across the globe and myriad other challenges constitute the greatest threat to fiscal stability in nearly a century.

Wise legislators like Sen. Jack Reed (D-R.I.) understand that some sacrifices, desperately needed now and in the future, will have to come from non-essential, big-ticket military programs. During a late-October press breakfast, he candidly admitted, “The bottom line is there is going to be significant pressure on defense budgets going forward.”

Surely the $560 million proposed for the F136 alternate engine in FY10 alone could be better spent elsewhere. After all, these funds, as well as the billions already spent, represent just a fraction of what it will really cost over the next five years to field the F136.

It has been reported recently that during nine months of system development and demonstration, the F136 has managed just over 50 hours of testing and has suffered four known failures; that’s one failure for every dozen hours of test. The F136 team likes to tout having hundreds of hours of accomplished testing….unfortunately, that testing was pre SDD and was not accomplished with the same engine now facing so many setbacks.

Over a comparable length of SDD time, Pratt & Whitney’s F135 logged more than 700 hours with no failures. To date, those numbers stand at 12,800 hours and just four incidents which caused a delay in testing.

One of the F135 engines was recently disassembled after 2,500 cycles, equaling eight years of life, and it looked pristine, (if only I could share the photos with you). Meanwhile, another F135 engine recently logged more than 38 continuous hours of altitude qualification testing, the longest run of its type yet.

The contrast between the two programs couldn’t be starker. While the F135’s logbook grows by the day, it is reported that F136 test slots at the U.S. Air Force’s Arnold Engineering Development Center will go unused for the next several months.

When President Barack Obama signed the defense authorization bill on October 28, he stated, "This bill isn't perfect. There is still more waste we need to cut. There are still more fights we need to win."

We agree with him, Defense Secretary Gates and others. Proposed funding for a would-be second engine is not only unaffordable, but will simply prolong an increasingly uncompetitive alternative that ironically means less choice for American taxpayers.

-- Eagleblogger

Monday, November 2, 2009

Why 70% Doesn’t Even Come Close

Proponents of the unnecessary F136 alternative engine, including some U.S. Senators, like to say that the alternate engine is 70% complete and therefore worthy of continued funding.

But that figure, if it’s even accurate, applies just to the initial system development and demonstration (SDD) phase, a milestone met by Pratt & Whitney’s F135 engine roughly five years ago. Traditionally, less than half the money needed to field a new engine is spent during SDD. As if the $600 million wasted annually on a delayed, duplicative engine isn’t bad enough, consider that a far larger sum of money ($4-5 billion according to Pentagon and other independent estimates) will still be required to bring the alternate engine to production, costs which include creating duplicative test and production facilities, not to mention an entire supply chain.

Even the most optimistic of F136 scenarios ultimately means a competitive lot wouldn’t be awarded until at least 2013, with deliveries starting in 2015. How much of the taxpayers’ money will Congress continue to waste on an engine with no proven history or legacy of success and a design started from a blank sheet of paper? The F135 engine was built on the proven legacy of the Pratt & Whitney F119 engine, powering the U.S. Air Force F-22 fleet. The F119 is the most successful military fighter engine ever fielded and has accumulated 125,000 operational flight hours. That is the pedigree of the F135. The F136 alternate engine has no pedigree, and introducing a new, unproven backup engine just adds extra costs with no benefit to reliability. In fact, it increases risk.

Supporters of the backup engine have stood by the F136 on the very issue of competition despite numerous reports indicating that competition offers no guaranteed cost savings but rather will cause additional expense. How many additional billions of dollars must be spent between now and the time the F136 is even ready to compete? While alternate engine proponents--- through smoke and mirror messaging--- would like us to believe that the money already invested in the backup engine represents 70% of what is needed to make the alternate engine a reality, the truth is that their “70% complete” statement is both a misrepresentation of facts and misleading. The alternate engine is not 70% complete. There is still a very long and expensive development and test road ahead for the alternate engine, and it is littered with challenges which the program must overcome. Pratt & Whitney has been travelling that road for the past eight years. And with more than 12,800 hours, the F135 engine is in production and is the only engine powering the F-35 flight test program, successful flight after successful flight.

President Obama, Secretary Gates and many members of Congress have already rightfully concluded that the “new math” just doesn’t add up.

-- Eagleblogger

Monday, October 19, 2009

More Engines = Fewer F-35s?

Those of us just young enough to remember our childhood will recall the cartoon character Wimpy from Popeye who promised, “I’ll gladly pay you Tuesday for a hamburger today.” Even in our formative years, this ruse was a clarion call to be wary of deals that seem to good to be true.

Surely the same can be said for the increasingly desperate attempts by alternative engine proponents to mask the true costs of this still nascent program, not just now, but in the so-called “out years” as well. But don’t take our word for it.

Defense Secretary Robert Gates, a consistently vocal critic of the alternative engine sent a letter on October 14 to House Defense Appropriations Chairman John Murtha stating, “This program is unnecessary and could disrupt the overall JSF program by diverting resources away from efforts needed for the continuation of the program. If the final bill presented to the President would seriously disrupt the JSF program, I would recommend that he veto the bill.” Strong words indeed from a man who has served two presidents of opposing parties in the role of defense secretary, especially given the vital needs driven by two ongoing wars in Southwest Asia and emerging threats elsewhere in the world.

According to Congressional Budget Office testimony to the House Budget Committee that same day, the Pentagon will need non-war spending to average six percent more than the amount sought for FY10 over the next 18 years to fulfill the current administration’s plans. Yet, real growth in military and civilian pay and benefits, combined with projected increases in operations and maintenance costs exacerbated by the current high operations tempo, will consume roughly two-thirds of the DOD budget. House Budget Chairman John Spratt said these fixed costs could “squeeze out” funding for R&D and procurement, both vital to military equipment recapitalization. Steve Daggett from the Congressional Research Service testified that acquisition accounts could decrease from 35 percent of the FY10 budget to just 24 percent in FY20.

Pentagon Press Secretary Geoff Morrell amplified Secretary Gates’ sentiment, also from October 14. “Let me take this opportunity to note that even if the Congress provides an appropriation in one year, and it doesn't potentially impact additional airframes, a one-year allocation doesn't deal with how we look at a potential second engine program,” he said. “We look at this over at least a five-year time span, and we need to have a better sense of the funding stream over the life of that program.”

Therefore, every dollar counts, arguably even more as the years pass. A proposed House-Senate compromise F136 funding line of $560 million in FY10 to pay for the extra engine simply cannot be expected in future budget cycles. The figures from the recent CBO testimony make that abundantly clear. Alternate engine proponents make much of the money already spent for this engine as a rationale for continuing it. Let’s be clear, to field the alternate engine, by the government’s own figures, will cost an additional $4-$5 billion. The fallacy of the sunk cost is one of the most common decision traps. Funding this engine this year, an engine our warfighters say they don’t need and don’t want, and that is years behind the primary engine that the President and Secretary of Defense say works and that they are pleased with, is truly throwing good money after bad.

Ironically, this unfunded mandate for an extra engine could come at the expense of total F-35 airframes, the worst possible outcome for our armed forces. Wasteful duplicity is bad enough. But to do so in a way that is unsustainable and may actually result in fewer F-35 aircraft, thereby driving up the unit cost of each with no increase in capability, is a lose-lose proposition that is simply irresponsible. Sadly, unlike our two-dimensional friend Wimpy, it’s no joke.